FBW A32NX Master Checklist

Gate-to-gate checklist overview

0 of 112 items complete across all phases.

Cockpit Preparation & Electrical Power-Up

Safety-of-aircraft checks before applying power, then battery/external power on and ADIRS alignment.

Systems Tests & Cockpit Setup

Fire/warning tests, standby instruments, MCDU flight-plan initialization, and cabin setup.

APU Start & Ground Services Completion

Start the APU, bring APU bleed online, and confirm ground services are complete.

Pushback & Engine Start

Pushback from the gate, then start engine 2 and engine 1 in turn with explicit indication checks for each.

After-Start Checks & Takeoff Configuration

Complete the after-start flow and verify the aircraft is configured for takeoff.

Taxi & Before Takeoff

Taxi to the runway, performing the before-takeoff checklist and final light sequencing.

Takeoff & Initial Climb

Set takeoff thrust, observe V-speeds, and transition to the climb profile after liftoff.

Climb & Cleanup After Takeoff

Clean up exterior lighting and configuration through the climb to cruise altitude.

Cruise Preparation for Descent

Enter destination weather/performance data and brief the arrival before starting descent.

Descent

Fly the descent profile, monitor constraints, and transition the altimeter back to QNH.

Approach & Landing

Arm and capture the approach, configure flaps/gear for landing, and fly the final approach to touchdown.

Landing & After-Landing Cleanup

Complete the landing roll, then clean up spoilers, flaps, and exterior lighting during the vacate taxi.

Shutdown & Securing the Aircraft

Shut down both engines, transfer to ground power, and secure the aircraft at the gate.

Reset entire checklist?

This will clear 0 completed item(s). This cannot be undone.