Gate-to-gate checklist overview
0 of 112 items complete across all phases.
Cockpit Preparation & Electrical Power-Up
Safety-of-aircraft checks before applying power, then battery/external power on and ADIRS alignment.
Systems Tests & Cockpit Setup
Fire/warning tests, standby instruments, MCDU flight-plan initialization, and cabin setup.
APU Start & Ground Services Completion
Start the APU, bring APU bleed online, and confirm ground services are complete.
Pushback & Engine Start
Pushback from the gate, then start engine 2 and engine 1 in turn with explicit indication checks for each.
After-Start Checks & Takeoff Configuration
Complete the after-start flow and verify the aircraft is configured for takeoff.
Taxi & Before Takeoff
Taxi to the runway, performing the before-takeoff checklist and final light sequencing.
Takeoff & Initial Climb
Set takeoff thrust, observe V-speeds, and transition to the climb profile after liftoff.
Climb & Cleanup After Takeoff
Clean up exterior lighting and configuration through the climb to cruise altitude.
Cruise Preparation for Descent
Enter destination weather/performance data and brief the arrival before starting descent.
Descent
Fly the descent profile, monitor constraints, and transition the altimeter back to QNH.
Approach & Landing
Arm and capture the approach, configure flaps/gear for landing, and fly the final approach to touchdown.
Landing & After-Landing Cleanup
Complete the landing roll, then clean up spoilers, flaps, and exterior lighting during the vacate taxi.
Shutdown & Securing the Aircraft
Shut down both engines, transfer to ground power, and secure the aircraft at the gate.